INDIAN GOVT. CAN COLLECT
RS. 80,000 CRORES
LYING INSIDE NEW DELHI
RAILWAY STATION
MONETISE ARIEL SPACE
OVER PLATFORMS BY CONSTRUCTING MEGA BUSINESS COMPLEX
INTRODUCTION
Railway Minister Shri D.V. Sadananda Gowda, in his 2014 Budget Speech has mentioned, “in the last 10 years, 99 New Line projects worth ` 60,000 crore were sanctioned out of which only one project is complete till date. In fact, there are 4 projects that are as old as 30 years, but are still not complete.” The principal reason attributed by the Hon’ble Minister for the dismal performance is lack of availability of adequate financial resources. The Hon’ble Minister has further announced some new projects. But the big question is how the Railways will fund these schemes.
Traditional funding sources have already been exploited to their optimum level. Now the Railway Board has to look for some unconventional sources to fund the operational and developmental projects.….. including Prime Minister, Narendra Modi’s Bullet Train. If, the authorities involved in the process look beyond their centuries old rule book…….solutions are not far from reach.
To be more precise, the freely available Railway Real Estate assets have the required potential to generate enormous surplus to meet its financial needs and also to strengthen the Railways Balance Sheet to the envy of any successful corporate in the world.
India has at least 500 - 700 major Railway Stations Real Estates assets, which can be developed for augmenting Railway revenue. Each of the Railway Station occupies sizable land. This station land over the platforms and adjoining Railway lines can be easily monetized. A multi-story multipurpose complex can be constructed without disturbing the regular functioning and movement, over the Railway platforms. This real estate can be easily marketed to generate capital and revenue profits. The monetary valuations of these properties can run into astronomical figures.
Keeping in view the size of the city, a multistory complex can be erected over any railway stations. The construction can be done on BOT basis or contract basis etc. depending on various factors. The research data suggests, the space available can be easily marketed as the railway stations are always city centers and enjoy tremendous locational advantages.
LATENT SPACE POTENTIAL
According to a rough estimate, an average Railway Station occupies at least 3,00,000 sq. mtrs.(750 mtr. *400 mtr. ). So, each station can provide a minimum developable land base area of 750*400 = 3,00,000 sq. mtr. If a 60 story building is constructed over New Delhi Railway Station utilizing the entire 3,00,000 sq. mtr. of land space, it will provide a Building Complex consisting of 1.8 crore sq. mtrs. of usable floor space. This will be the most attractive property in town due to its central location and confirmed foot fall. Besides, the backing of the Government will do the needful branding for enhanced property valuations. The building complex can be designed considering the population and business requirements. The numerics of the project are presented herein below.
Traditional funding sources have already been exploited to their optimum level. Now the Railway Board has to look for some unconventional sources to fund the operational and developmental projects.….. including Prime Minister, Narendra Modi’s Bullet Train. If, the authorities involved in the process look beyond their centuries old rule book…….solutions are not far from reach.
To be more precise, the freely available Railway Real Estate assets have the required potential to generate enormous surplus to meet its financial needs and also to strengthen the Railways Balance Sheet to the envy of any successful corporate in the world.
India has at least 500 - 700 major Railway Stations Real Estates assets, which can be developed for augmenting Railway revenue. Each of the Railway Station occupies sizable land. This station land over the platforms and adjoining Railway lines can be easily monetized. A multi-story multipurpose complex can be constructed without disturbing the regular functioning and movement, over the Railway platforms. This real estate can be easily marketed to generate capital and revenue profits. The monetary valuations of these properties can run into astronomical figures.
Keeping in view the size of the city, a multistory complex can be erected over any railway stations. The construction can be done on BOT basis or contract basis etc. depending on various factors. The research data suggests, the space available can be easily marketed as the railway stations are always city centers and enjoy tremendous locational advantages.
LATENT SPACE POTENTIAL
According to a rough estimate, an average Railway Station occupies at least 3,00,000 sq. mtrs.(750 mtr. *400 mtr. ). So, each station can provide a minimum developable land base area of 750*400 = 3,00,000 sq. mtr. If a 60 story building is constructed over New Delhi Railway Station utilizing the entire 3,00,000 sq. mtr. of land space, it will provide a Building Complex consisting of 1.8 crore sq. mtrs. of usable floor space. This will be the most attractive property in town due to its central location and confirmed foot fall. Besides, the backing of the Government will do the needful branding for enhanced property valuations. The building complex can be designed considering the population and business requirements. The numerics of the project are presented herein below.
PROPOSED
MULTISTORIED BUILDING COMPLEX OVER RAILWAY PLATFORMS
|
||||||
TOWN POPULATION (IN
LAKHS)
|
100+
|
100 - 75
|
75-50
|
50-25
|
25
|
|
NO. OF PROPOSED
FLOORS
|
60
|
40
|
30
|
10
|
8
|
|
FLOOR APPLICATION
|
||||||
FOR RAILWAY PURPOSES
|
12
|
8
|
6
|
2
|
1
|
|
HOTELS &
RESTAURANTS
|
8
|
6
|
4
|
1
|
1
|
|
SHOPPING
|
9
|
6
|
4
|
1
|
1
|
|
HOSPITALS
|
8
|
6
|
4
|
1
|
1
|
|
OFFICES
|
9
|
6
|
4
|
1
|
1
|
|
SPORTS
|
3
|
1
|
2
|
1
|
1
|
|
PARKING
|
8
|
5
|
4
|
1
|
1
|
|
Non-Usable
(Facilities)
|
3
|
2
|
2
|
2
|
1
|
|
HELIPAD
|
ROOF
|
ROOF
|
ROOF
|
ROOF
|
ROOF
|
FINANCE FOR DEVELOPMENT
The investments for the development can be channelised through private sector participation. Besides, World Bank, Asian Development Bank and other International Financial Institutions offering low rate funding can also be roped in. The private sector can join hands on BOT basis. However, the Government or Railways will not be required to spend or invest any amount in this project as they are contributing land into the kitty. In fact, the Railways may expect substantial cash advances from day one from Real Estate Developers and through advance bookings of real estate. Since, an income generating assets is being created the funding from International Financial Institutions will also be feasible.
COST - BENEFIT ANALYSIS
To explain the cost benefit analysis, New Delhi Railway Station can be a representative sample.
Cost
Presumptions:
Cost Presumptions
|
||||
1.
Size of the Proposed Multi-Storied Complex
|
||||
a.
Length
|
750 Sqm.
|
|||
b.
Breadth
|
400 Sqm.
|
|||
c.
No. of Floors
|
60
|
|||
d.
Total Area
|
1.80 Crores Sqm.
|
|||
2.
Cost of Construction
|
Rs.
40,000 sqm.
|
|||
3.
Cost of Construction
|
Rs.
72,000 Crores
|
|||
4.
Incidental/ Interest Cost
|
Rs.
8,000 Crores
|
|||
5. Total
Cost
|
Rs. 80,000
Crores
|
|||
Building Valuations:
Building Valuations
|
||||
1
|
Constructed
Area
|
1.8 Crores
Sqm.
|
||
2
|
Most
Conservative Rate of Commercial Property in Central Delhi
|
Rs. 3,00,000
/ Sqm.
|
||
3
|
Value of New
Assets
|
Rs. 5,40,000
Crores
|
||
4
|
Notional
Cash Profit from one Railway Station
|
Rs. 5,00,000
Crores
|
||
Revenue Calculations:
It is presumed that, 20% ( 12 Floors ) of the space will be offered to the Railways for their use without any cost. Out of the balance 80%, 30% ( 18 Floors ) is sold on ownership basis at commercial rates in the market and the rest 50% ( 30 Floors ) is leased out to earn regular cash income to meet the annual operational cost of the Railways.
Revenue Calculations
|
||||
Nil (
Free )
|
||||
1.
Revenue from Railways ( 12 Floors)
|
||||
2.
Revenue from 30% ( 18 Floors ) salable area
|
||||
(Shopping Arcade + Office Space)
|
||||
= 54
Lakh Sqm @ Rs. 3,00,000
|
Rs.
1,62,000 Crores
|
|||
3. Cost
of 30% Salable Construction Area
|
Rs.
24,000 Crores
|
|||
=54 Lakh @
Rs.40,000 Per Sqm
|
||||
4. Cash
Profit from 30% Area
|
Rs.
1,38,000 Crores
|
|||
5.
Annualised Rental Earnings ( 30 Floors )
|
||||
a. Hotels (24 Lakh Sqm. @ Rs.
18,000 Sqm)
|
Rs. 4,320
Crores
|
|||
b.
Hospitals (24 Lakh Sqm. @ Rs. 4,500 Sqm)
|
Rs. 1,080
Crores
|
|||
c. Sports
(9 Lakh Sqm @ Rs. 4,500 Sqm)
|
Rs. 405
Crores
|
|||
d.
Parking (24 Lakh Sqm. @ Rs. 4,500 Sqm)
|
Rs. 1,080
Crores
|
|||
e.
Surplus Floors ( 9 Lakh Sqm @ Rs 4,500 Sqm )
|
Rs. 405
Crores
|
|||
Total
Annualised Rental Earnings
|
Rs. 7,290
Crores
|
|||
It is mind boggling to note that, one single
station has the potential to provide Rs. 1,38,000 Crores of Capital Profit, an
Annual Rental Earning of Rs. 7,290 Crores and a Fixed Asset addition of Rs.
3,78,000 Crores to the Balance Sheet of the Railways. If the figures are
multiplied appropriately, keeping in mind total number of Railway Station
available in the country for development, the result will be astonishing. It may
also be noted that all figures have been conservatively considered from revenue
point of view.
Michigan Central Railway Station in Detroit, This was tallest rail station in the world when it was built in 1913. |
We have noted some reservations about the operational feasibility of this project. A few intellectuals and academic scholars have also put forward their qualms about the viability of the project. Their views are summarised here in below.
1. India does not have technology to construct such big building complex.
2. India does not have cement and steel for this mega requirement.
3. India does not have trained engineers to handle these projects
4. India does not have construction equipment.
5. India does not have political will to do innovative projects.
6. Indian bureaucrats may not like such out of box thinking.
7. Delhi does not have required electricity and water for the projects.
8. There will be problem of fire safety.
9. Terrorist, Pakistan / China may bomb the building in case of war.
10. There will be dislocation of train movement during construction.
11. Airport Authority will not agree with the project.
12. Ministry of Environment will not agree as it does not have adequate sever facilities for such mega projects.
13. In democratic country such schemes are not possible.
14. Indian Courts will stop the construction on any ground.
15. The ASI may say, it will destroy the historical beauty of the Railway Station.
16. It will be difficult to save the building in case of earthquake.
17. Big buildings should not be constructed in large towns.
Besides, above many other objections can be placed against any scheme of development. Nevertheless, if country has to go forward only strategic thinking and audacious decisions are the answers. In Detroit, United States a multi-storied building over the railway station was constructed in 1913 almost 101 years before. Delhi Metro in its initial stage faced far more resistance than what is mentioned above. No body believed that, Metro Tunnel can be constructed without demolishing Chandni Chowk and adjoining Chawri Bazar Market. People also said that, “Metro will always be a security risk”. Metro provided superb market to steel and cement companies. International Construction Companies with experience of such gargantuan projects are ever ready to undertake projects in India in partnership with Indian companies. When China had to construct a water reservoir and dam for electricity generation, it gently moved thirteen large cities and hundreds of villages from their original location. This success was achieved because of support to the working executives in field and determination of the Governing Bodies. In case of Delhi Metro also, Mr. Shiridharan provided the leadership and direction and he was whole heartedly supported by Bureaucracy, Judiciary and the Government. Very fortunately Indian NGOs and the opposition parties also did not play negative.
Such projects can also come up on public utility buildings used as Bus-Stands in small towns, Sea-Ports and surplus government properties.
If the Hon’ble Railway Minister and our enterprising Prime Minister can implement this project, no surprise the entire country will be covered by the network of Bullet Trains.
----------------------------------------------------------------------------
*********The author CA A. K. Jain invites suggestions, views and opinions from the readers. Please use the comment box herein below. – Thank You*********
Superb information shared here. Thanks for sharing. office property for lease
ReplyDeleteFrom: Rohit Khanna
ReplyDeleterohit_khanna@hotmail.com
Sent: 22 December, 2014 3:19 PM
To: caindia@hotmail.com
Cc: suresh_khanna@hotmail.com
Subject: Our meeting last week
Dear Mr Jain, it was good to meet you last week when my father, Gp Capt Suresh Khanna and I visited your Pusa Road office. You had mentioned some articles on the creation of personal trusts. If you could provide links to those we can review them and get back to you on implementing the same for our requirement.
The New Delhi Railway Station redevelopment idea that you shared was very interesting and we wish you the very best and hope it takes light. I had mentioned that New York City is doing exactly the same with their plan to build 12 million sq feet of usable space over the Hudson Railway Station in NY. Here are a few links to some articles that provide an overview as well as how they overcame various obstacles to move this forward including many of those you had mentioned. I hope you find them useful.
Fortune Magazine : "NYC’s Hudson Yards project will be an entire city — on stilts" : http://fortune.com/2014/09/04/hudson-yards-city-on-stilts/
New York Times Article : http://www.nytimes.com/2009/12/22/nyregion/22hudson.html?_r=0
A great overview of what it will look like including the many towers and open spaces being built. : http://www.hudsonyardsnewyork.com/the-story. best regards,
Rohit KhannaRohit Khanna [rohit_khanna@hotmail.com]
Great idea
ReplyDelete